Arial Khan river bridge construction delay

Two Bridges Over Arial Khan river: Locals struggle amid construction delay

The prolonged construction of two crucial bridges over the Arial Khan river in Barishal has left thousands struggling.

March 28, 2025
March 28, 2025

Two Bridges Over Arial Khan river: Locals struggle amid construction delay

The prolonged construction of two crucial bridges over the Arial Khan river in Barishal has left thousands struggling.